
Manor Farm Academy
DWB Contractors contributed significantly to the construction of Manor Farm Academy, providing essential building envelope and interior finishes.
Our Scope of Work Included:
Structural Framing: Installation of Metsec SFS infill and load-bearing wall systems for a robust and efficient building structure.
External Cladding: Application of Stenni cladding to the external perimeter of the school building, providing a durable and aesthetically pleasing exterior.
Internal Partitioning: Construction of British Gypsum metal stud partitions for creating well-defined classrooms, offices, and other necessary spaces.
Surface Finishes:
Professional plastering for smooth and even surfaces throughout the building.
Installation of an Ecophon lay-in grid system ceiling, providing excellent acoustics and a modern aesthetic.
Carpentry and Joinery: Comprehensive first and second-fix carpentry and joinery work, including doors, windows, and internal fittings.
Power in Numbers
LINCOLN, LINCOLNSHIRE
Location
D BROWNS
Client
EDUCATION
Sector
Project Gallery

