top of page

Wygate Park Academy

DWB Contractors played a key role in the construction of Wygate Park Academy, contributing to the creation of a modern and functional educational facility.

Our Scope of Work Included:

  • Structural Framing: Installation of Metsec SFS infill and load-bearing wall systems for a robust and efficient building structure.

  • External Cladding: Application of Stenni cladding to the external perimeter of the school building, providing a durable and aesthetically pleasing exterior.

  • Internal Partitioning: Construction of British Gypsum metal stud partitions to create well-defined classrooms, offices, and other necessary spaces within the academy.

  • Surface Finishes:

    • Professional plastering to ensure smooth and even surfaces throughout the building.

    • Installation of an Ecophon lay-in grid system ceiling, providing excellent acoustics and a modern aesthetic.

  • Carpentry and Joinery: Comprehensive first and second-fix carpentry and joinery work, including doors, windows, and internal fittings.

Power in Numbers

SPALDING, LINCOLNSHIRE

Location

LANGWITH CONSTRUCTION

Client

EDUCATION

Sector

Project Gallery

bottom of page