
Wygate Park Academy
DWB Contractors played a key role in the construction of Wygate Park Academy, contributing to the creation of a modern and functional educational facility.
Our Scope of Work Included:
Structural Framing: Installation of Metsec SFS infill and load-bearing wall systems for a robust and efficient building structure.
External Cladding: Application of Stenni cladding to the external perimeter of the school building, providing a durable and aesthetically pleasing exterior.
Internal Partitioning: Construction of British Gypsum metal stud partitions to create well-defined classrooms, offices, and other necessary spaces within the academy.
Surface Finishes:
Professional plastering to ensure smooth and even surfaces throughout the building.
Installation of an Ecophon lay-in grid system ceiling, providing excellent acoustics and a modern aesthetic.
Carpentry and Joinery: Comprehensive first and second-fix carpentry and joinery work, including doors, windows, and internal fittings.
Power in Numbers
SPALDING, LINCOLNSHIRE
Location
LANGWITH CONSTRUCTION
Client
EDUCATION
Sector